58-dock-svgrepo-com.svg

200

Meters Jetty of 10.000 DWT

With a water depth of 8-12 m and protected by an island located in front of it, it allows the jetty to operate all year round without any restrictions.

59-oil-platform-svgrepo-com.svg

40000

Tons Annual Throughout

Impressive up to 40,000 tons annual capacity,demonstrating our ability to efficiently and effectively.

60-analysis-svgrepo-com.svg

46

Hectares Total Fabrication Area

Designed in few zones to maximize the flow of production between lay down, warehouses, fabrication shops, and erection activities

Image

Welcome to PT. Meitech Eka Bintan

Leading Integrated Steel and Module fabricator for Oil and Gas, Energy and Petrochemical Industry.

As a subsidiary of PT. MEINDO ELANG INDAH, which has more than 30 years experiences in Oil and Gas, Energy and Petrochemical Industry, we are collectively committed to deliver each project safely, in accordance with the project's highest quality standards

Read More

13

Fabrication Workshop

3

Office Builidng

3

Standards ISO

20+

Milions Safe Hours

Core Business

Our Capabilities

slide-03.jpg

Modules

+
slide-04.jpg

Jacket

+
slide-03.jpg

Top Side

+

Facilities

Supporting Facilities

215-Meitech .jpg

Discover our fully equipped supporting facilities in Zone A — a non-hard hat area designed for safety and comfort. Featuring modern offices, accommodation, HRD, clinic, and secure site access to support efficient daily operations.

OPERATION SUPPORTS

+
88-thumbnail 2.jpg

Our workshop fabrication services where we offer customized solutions such as welding, cutting, bending, and assembly. Our state-of-the-art workshop is equipped with the latest technology and staffed with experienced professionals who prioritize safety and quality in all our processes.
                          

FABRICATION SHOP AND WAREHOUSES

+
96-slide-3.jpg

 Our heavy equipment is designed to handle tough conditions and heavy loads. Each piece is well-maintained and our experienced professionals can help you select the right equipment for your project.
                          

FABRICATION AND ERECTIONS

+
71-HCML.jpg
72-CSTS.jpg
73-medco energi.jpg
74-pertamina-hulu-energi.jpg
75-meindo.jpg
208-Pertamina Hulu Mahakam_Rev-02.jpg
77-jawa-satu-power.jpg
211-208-Pertamina Hulu Mahakam_Rev-02.jpg

HCML Husky-CNOOC Madura Limited

MAC WHP

MAC WHP will be a minimum facilities 3-legs unmanned wellhead platform with 5 well slots (3 slots for present, 2 slots for spare). Gas lines from each well are routed directly by using flexible jumper lines to MOPU.

CSTS (CHIYODA, SAIPEM, TRIPATRA AND SAE) JOINT OPERATION

BP TANGGUH ONSHORE

BP Berau Tangguh LNG Train 3 is an LNG plant converting natural gas into liquid natural gas and send to Indonesia and overseas. Pipe installation and support pipe racks is one key suppoting for the project. Construction pipe racks modularization divided into total 75 modules, 26 modules are for middle route area and 49 modules for jetty area.

MEDCO E&P NATUNA LTD.

FOREL BRONANG

The Forel and Bronang fields are an offshore prospects located in Block B of the Natuna Sea. Forel field is located in 24 km of Northwest Belanak, while Bronang field is located 40 km of Northwest Belanak and has 300 feet water depth inaverage.

PT PERTAMINA HULU ENERGI WEST MADURA OFFSHORE

YY Field Development Optimization

 Refurbish YYA Platform, Deck Extension, New Equipment (Power System, Sea Water Transportation Systems) Build a 12 inch 3-phase subsea pipeline along ± 1 km from the new location. New Offshore Platform “up to tie-in to the existing YYA KLB pipeline (rigid connection and abandon +1.7 km of existing pipeline remaining from the existing YYA P/F tie-in location) Brownfield modification in KLB and KLA (instrumentation and monitoring system).
                                

PT MEINDO ELANG INDAH

 Meindo is an Indonesian construction and engineering company that was established in 2004. The company provides a range of services, including civil and building construction, mechanical and electrical engineering, project management, and procurement. Meindo has worked on various infrastructure projects in Indonesia, such as power plants, airports, and ports. The company is committed to providing high-quality services and delivering projects on time and within budget while prioritizing safety and environmental sustainability.
                                

PERTAMINA HULU MAHAKAM

Sisi Nubi AOI

The Sisi Nubi AOI Project, led by PT Pertamina Hulu Mahakam, represents a landmark offshore field expansion fabricated by PT Meitech Eka Bintan. With six new topside platforms installed using cutting-edge Suction Pile Foundation technology, 22 km of subsea pipeline, and over 8 million safe man‑hours worked, the project delivers approximately 30 MMSCFD per platform. Fabricated and sailed between April and June 2025, it stands as a milestone in Indonesia’s offshore development and energy security.

JAWA SATU GAS

Jawa Satu Gas Infrastructure and Marine Works

PT Pertamina (Persero) have formed a Consortium with Marubeni Corporation and Sojitz (“Owner”) for the development of LNG Floating Storage and Regasification Facilities including mooring system and gas transmission line i.e. offshore & onshore gas pipeline and Onshore Receiving Facility (ORF) facilities at the receiving point at Cilamaya site in North Java “Facilities”.
                                

PERTAMINA HULU MAHAKAM

JUMELAI SISI NUBI

 Pertamina Hulu Mahakam is a subsidiary of Pertamina, the state-owned oil and gas company of Indonesia. The company is engaged in the exploration and production of oil and gas in the Mahakam block, located in East Kalimantan, Indonesia. Pertamina Hulu Mahakam took over the operations of the Mahakam block from Total E&P Indonesie in 2018. The Mahakam block is one of the largest natural gas producing blocks in Indonesia, and Pertamina Hulu Mahakam is committed to maximizing its potential through sustainable and responsible operations.
                                

Latest Events

Latest From Our Events

Image

PHM Gelar Seremoni Sail Away Topside Platform Proyek SNB AOI 1-3-5

+

PT Pertamina Hulu Mahakam gelar seremoni sail away tahap kedua Proyek SNB AOI di Tanjung Pinang, mendukung target produksi migas nasional dan ketahanan energi lewat inovasi teknologi Suction Pile Foundation dan komitmen HSSE.

Image

YYA LOADOUT BINTAN

+

KBRN, Bandung; Sejumlah tahapan teknis mencakup fabrikasi dan sertifikasi anjungan serta serangkaian FAT (Factory Acceptance Test) oleh Kontraktor EPCI, PT Meindo Elang Indah telah dilakukan.

Image

PHM STARTS JSN PROJECT SAIL AWAY JACKET PROCESS

+

PT Pertamina Hulu Mahakam (PHM) as the operator in the Mahakam Working Area (WK), with the support of SKK Migas and PT Pertamina Hulu Indonesia (PHI) as the holding