Client :
Husky-CNOOC Madura Limited
Project Description :
Fabrication and Construction Topside, Jacket & Piles. MAC WHP will be a minimum facilities 3-legs unmanned wellhead platform with 5 well slots (3 slots for present, 2 slots for spare). Gas lines from each well are routed directly by using flexible jumper lines to MOPU. Project consist of:
- 1 unit 3-legs jacket
- 1 unit 3-legs topside
- 1 unit Subsea valve protection frame
- 1 unit hot tap protection frame
- Associated pipelines and riser pipe
Project Location :
Madura Straits
Scope of work :
Assembly of pre-fabricate structural, fabrication and erection of jackets and topsides, blasting and painting, yard completion and load out and sea fastening of completed Modules.
CONTRACT PERIOD :
January 2022 – June 2022